Steel construction for VW West in Wolfsburg
In March 2020, Lausitzer Stahlbau Ruhland GmbH was honoured by the Mitsubishi Power Europe GmbH the order to Production of around 3,200 tonnes of steel construction for the „VW West“ construction project in Wolfsburg.
In February 2021, as part of an order extension, we also took over the Workshop planning including final model processing, connection statics and the creation of workshop and assembly plans for secondary steel construction at the Wolfsburg site.
For this challenging industrial project in the Power plant and plant steel construction comprised our service portfolio:
Engineering and workshop planning
3D model processing and connection statics
Creation of workshop and assembly plans
Production of approx. 192 tonnes of secondary steel construction
Production of approx. 2.4 tonne ladders
Production of approx. 4.4 t railings
The railings were manufactured in collaboration with our partner company Groom and wolf in Kamenz.
The Coating of the steel structure, railings and ladders was carried out entirely within the company.
The execution took place:
to Corrosivity class C2 for indoor areas
to Corrosivity class C3 for outdoor areas
as 2-layer system
in different RAL colours defined by the client
Our in-house coating process ensures the highest quality standards in the area of Corrosion protection in steel construction.
The finished coated components were temporarily stored on the premises of Lausitzer Stahlbau Ruhland GmbH.
After call-off by Mitsubishi Power Europe GmbH, we took over:
Packaging of the steel components
Loading onto the lorries provided
on schedule Just-in-time delivery to the construction site
Due to the very limited space available for assembly and storage at the Wolfsburg site, a precisely coordinated logistics concept was required to ensure a smooth construction process.
With this project, Lausitzer Stahlbau Ruhland GmbH is emphasising its expertise in the field of Industrial steel construction, plant construction, secondary steel construction, workshop planning and just-in-time logistics for major projects in Germany.

Project: VW West
Location: Wolfsburg, Lower Saxony
Client: Mitsubishi Power Europe GmbH
Total steel construction: approx. 3,200 tonnes
Secondary steel construction: 192 t
Ladders: 2,4 t
Railings: 4,4 t
Scope of services: Engineering, production, coating, logistics
Project period: March 2021 - September 2021